Error message

Notice: Undefined offset: 0 in include_once() (line 545 of /mnt/storage/www/websites/lefresnoy.net/drupal/drupal-public/sites/prod/themes/babylon/templates/productions/page_production.php).

Piscine

image de l'oeuvre Piscine de  Marina Smorodinova

De Marina Smorodinova film 2018, 17min

Diffusions
  • 2018 - Exhib. Panorama 20 de Tourcoing (FR)

To write this I decided to start with a unique location: a swimming pool that made a strong impression on me.
I started going there often, meeting people, finding my film.
I discovered a “plot”: after forty years of service, the pool was closing for work. I now started writing a fiction and observing the pool in the present. I chose a large cast (30 people). I found my two main characters.
When I got to the editing suite I felt the poetic side of the place was lost. I erased my characters. I listened to what the images were telling me, while trying to get close to my feelings.
In the end I had the impression I was in the process of making “The Black Square” by Malevich: lots of thought, lots of work, to end up with a simple form, “doable in five minutes.”
In my case, however, it is a square drawn by a child aged four. It looks like a square, but it is still awkward. Squares are not easy to draw.

Remerciements Thanks

Piscine olympique Jean-Éric Bousch, Forbach.

Teaser
Images de l'oeuvre
Partenaires
  • Le Fresnoy - Studio national des arts contemporains, Tourcoing

Oeuvre de Marina Smorodinova produite par Le Fresnoy :

Retour à la liste des productions